Cases

Complete 5G system for Dogger Bank A

Written by Semco Maritime | Jan 2, 2023 2:13:21 PM

Complete 5G system

Customer: SSE Renewables & EquinorLocation: The UK sector
Period: 2022-2023

The Dogger Bank Wind Farm Project is a project, owned by SSE and Equinor. SSE and Equinor formed an incorporated 50/50 joint venture on 1 September 2017, to further develop the Dogger Bank A, B and C projects. The project is located 130 km from shore. 

Semco Maritime scope of supply in this project consists of the design, provision, frequency application process, configuration, installation, testing, commissioning and documentation of the complete 5G system.

The system includes 4 sectors each including 2 radios (RAN) operating in 700MHz respective 1800 MHz from Ericsson. The CORE is based on a standard server with release 16 CORE software from Athonet.

The scope also include fixed CPE for 4 SOV and SIM cards for all phones used. A service agreement is also included. 


Competences and systems
  • Project management
  • Interface to construction yard
  • Interfaces to data network
  • System construction
  • Ericsson 5G RAN and Athonet CORE
  • Rittal cabinet
  • Eltek UPS
  • Commissioning
  • Service contract