Cases

Electrical FEED Study Hailong 2 and 3

Written by Semco Maritime | Nov 3, 2018 11:00:00 PM

Electrical FEED Study

Customer: Northland Power & Yushan EnergyEnd customer: TaipowerLocation: Taiwan Strait, Taiwan
Period: 2018

A full electrical FEED study for the construction and installation of substation for the Hailong II and III offshore wind farm including array and export cable layout. The study included grid calculation, details around jacket construction and soil condition. Also cost models for the fabrication of 300MW, 512MW and 532MW OSSs were developed for the client.

Competences and systems
  • High- and medium-voltage systems
  • Low-voltage systems
  • Diesel generator systems
  • Protection and control systems
  • Project management
  • Drainage and waste systems
  • HVAC systems
  • Communication and IT systems
  • Platform identification systems
  • Transport/spacing
  • Electrical calculations
Highlights
  • The electrical FEED study was delivered within time and budget
  • High engineering performance on short terms
  • Positive customer feedback on the quality of work and communication