Power Management System Upgrade

Written by Semco Maritime | May 27, 2025 8:10:14 AM

Customer: OperatorLocation: Platform, UK North SeaPeriod: 2022 to 2024

Solution

An operator on one of the production platforms faced increasing issues with an obsolete power management system. Semco Maritime was contracted to design and build a new system. The system was reverse- engineered and migrated to a modern Siemens system, featuring dedicated client and server HMIs. An onshore simulator was established, and a full Factory Acceptance Test was conducted before approving construction. The Semco Maritime team subsequently completed the offshore installation, commissioning and testing.

Competences and systems
  • Surveying existing equipment and finding an upgrade path
  • Selecting and procuring PLC & HMI hardware
  • Designing PLC & HMI software for the system
  • Retrofitting and upgrading the existing control system
  • Offshore installation and electrical engineering
  • Project management
Highlights
  • Customized management system
  • Positive client feedback