title: Siemens Transport Frames
description: Design, calculations, DNV design approval and fabrication of 20-feet transport frames for gearbox and main shaft for 4 MW wind turbine.
---

[Cases ](https://www.semcomaritime.com/cases)

# [Siemens Transport Frames](https://www.semcomaritime.com/cases/siemens-transport-frames)

 Written by [Semco Maritime](https://www.semcomaritime.com/cases/author/semco-maritime) | Jun 17, 2015 10:00:00 PM

## Siemens Transport Frames

##### Customer: Siemens Wind Power Location: Esbjerg, DenmarkPeriod: 2015

Overall project scope included design, calculations, DNV design approval and fabrication of 20-feet transport frames for gearbox and main shaft for 4 MW wind turbine. Total weight of transport frames is approximately 40 tons.

##### Competences and systems

- Design
- Fabrication including factory acceptance test (FAT)
- Welding coordination
- Project management
- Documentation preparation

##### Highlights

- Complete project delivered on time
- Customer was very satisfied with our solution and performance
- There were no lost-time incidents (LTIs) or safety issues
- Design approval by DNV-GL

[View full post](https://www.semcomaritime.com/cases/siemens-transport-frames)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Semco Maritime"
  },
  "dateModified" : "2022-09-16T08:52:39.602Z",
  "datePublished" : "2015-06-17T22:00:00Z",
  "headline" : "Siemens Transport Frames",
  "image" : {
    "@type" : "ImageObject",
    "height" : 450,
    "url" : "https://campaigns.semcomaritime.com/hubfs/1.%20Renewables/Siemens%20Wind%20Power.png",
    "width" : 600
  },
  "mainEntityOfPage" : "https://www.semcomaritime.com/cases/siemens-transport-frames",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Cases"
  }
}
```