Seajacks Scylla

    

Customer

Seajacks

Location

Denmark

Period

September - December 2016

Project scope

The project scope consisted of fabrication and sea faseting of the Bladerack structure and Tower Grillage with adaptors. The sea fastening installed during this mobilisation will with minor modifications serve for three types of WTG’s.

Seajacks Scylla

Bilfinger, Pacific ORCA

    

Customer

Bilfinger Marine & Offshore Systems

Location

Denmark

Period

February – June 2015

Project scope

The project scope consisted of fabrication of 342 tons of sea fastening and handling equipment to facilitate the mobilisation of the foundations for the SANDBANK OWF. Scope included installation of the sea fastening and handling equipment on board the Pacific ORCA.

Open project reference
Bilfinger, Pacific ORCA

A2SEA, Sea Challenger

    

Customer

A2SEA

Location

Denmark

Period

April – July 2015

Project scope

The overall project scope consisted of fabrication and installation of helideck sub-structure on board the A2SEA Sea Challenger. The scope included project management from fabrication phase to installation phase including handover of the project to A2SEA.

Open project reference
A2SEA, Sea Challenger

Siemens Wind Power

    

Customer

Siemens Wind Power A/S

Location

Denmark

Period

January 2015 – May 2015

Project scope

The overall scope for the project consisted of design, calculation, DNV design approval and fabrication of 20 feet transport frames for gearbox and main shaft for a 4MW windturbine. Total weight of approx. 40 ton.

Open project reference
Siemens Wind Power