Customer: Valaris PLC
Period: 2023 Q2 and Q3
Location: Las Palmas & Brazil
Semco Maritime has been working closely with Valaris for the Reaction of the SCR systems for both Valaris DS 17 and Valaris DS 15
Solution:
- Inspection of SCR and components
- Inspection and function test of Urea supply and Injection System
- Inspection of control unit and functionality test
- Run engines to correct RPM + Load and carry out emissions check
- If emission levels are not met run diagnostic checks to determine cause.
- Repeat emissions check as necessary.
- Commissioning