Offshore wind farm assets

Telecommunication and IT

We provide integrated EPCI communication and IT solutions specifically designed for your offshore wind farm assets and communication systems for the entire wind farm.

Telecommunication and IT solutions for offshore wind farms:

Engineering studies and calculations

Our telecommunication and IT specialists design and calculate the optimum solutions for your assets and the entire wind farm.

Read more

Wind farm communication systems

We provide all critical systems for efficient communication in your offshore wind farm.

Read more

Offshore substation communication systems

As one of the pioneers in offshore substations we have many years of experience in designing and integrating the many systems needed on an offshore substation.

Read more

Turbine communication systems

We have the right solutions for communication inside and out side the wind turbine generator.

Read more

Offshore wind vessels

Explore our PAGA, radio, radar, navigational systems and more for offshore wind vessels.

Read more

Onshore communication systems

See our typical systems for onshore wind locations.

Read more

Operation, service and monitoring

We take care of all phases of telecommunication and IT projects.

Read more

Cyber security

We help enterprises bring risk under control by employing a systematic approach to cyber security.

Read more

We have done it before:

Cases and references

Case: Ørsted

Hornsea Project One

Design, installation and commissioning of infrastructure communication system for Hornsea Project One in the UK sector (2016-2019).

Case: Vattenfall

Kriegers Flak

Turnkey delivery of telecommunication solution including design, construction, test and commissioning of the Kriegers Flak transformer platform in the Baltic Sea. Most systems are interlinked via fibre networks between the two platforms, enabling access to and operation of the systems from either location and from the shore (2017-2018).

Case: Ørsted

Race Bank

The scope of supply included design, factory integration test and site acceptance test of communications infrastructure system for the Race Bank offshore substation in the UK North SeaRadio coverage of entire wind farm (Z01 and Z02)-91 WTGs and TETRA repeaters, separate OFTO and GEN PABX solution, EWS and TMS for remote configuration and management, fibre splice and patchwork on onshore substation (2015-2018).

Case: Ørsted

Walney Extension

Design, installation and commissioning of infrastructure communication system for Walney Extension (WOW03) in the Irish Sea. The scope of supply included: Project management, system construction, fibre splice and coaxial termination, PABX, AIS/ADS-B, Line of sight (LOS), TETRA, VHF (FM/AM), engineering work station (EWS) and telecom management system Cisco hardware components and services (2015-2018).

Wherever you are in the world, we have technicians ready to serve you.

Brian Boye

Senior Manager, Telecom products

bboy@semcomaritime.com
+45 7916 6939

Semco Maritime A/S
Esbjerg Brygge 30
6700 Esbjerg
Denmark

Andrew Wang

Senior Manager, Telecom products

wjt@semcomaritime.com
+65 6361 0879

Semco Maritime Pte Ltd.
20 Toh Guan Road
07-03 CJ Korea Express Building
Singapore 608839

Singapore

 

semco@semcomaritime.sg

Semco Maritime Pte Ltd.
20 Toh Guan Road
07-03 CJ Korea Express Building
Singapore 608839

Company reg. no. 200616492K (also GST)

Head office
Esbjerg, Denmark

semco@semcomaritime.com
+45 7916 6666

Semco Maritime A/S
Esbjerg Brygge 30
6700 Esbjerg
Denmark

CVR no. DK 2549 0762