Jean Grandt
Sales Director, Transitional Energies
Semco Maritime A/S
Esbjerg Brygge 30
6700 Esbjerg
Denmark
General enquiries
Tel. +45 7916 6666
semco@semcomaritime.com
Semco Maritime
Esbjerg Brygge 30
DK- 6700 Esbjerg
The project scope consisted of fabrication and sea fastening of the bladerack structure and tower grillage with adaptors. The sea fastening installed during this mobilisation will with minor modifications serve for three types of WTG’s. Delivered from Esbjerg, Denmark (2016).
The project scope consisted of fabrication of 342 tons of sea fastening and handling equipment to facilitate the mobilisation of the foundations for the Sandbank offshore wind farm. Scope included installation of the sea fastening and handling equipment on board the Pacific ORCA in Esbjerg, Denmark (2015).
The overall project scope consisted of fabrication and installation of helideck sub-structure on board the A2SEA Sea Challenger. The scope included project management from fabrication phase to installation phase including handover of the project to A2SEA. Delivered from Esbjerg, Denmark (2015).
The overall scope for the project consisted of design, calculation, DNV design approval and fabrication of 20 feet transport frames for gearbox and main shaft for a 4 MW wind turbine. Total weight of approx. 40 ton. Delivered from Esbjerg, Denmark (2015).
Sales Director, Transitional Energies
Semco Maritime A/S
Esbjerg Brygge 30
6700 Esbjerg
Denmark
Head office
Semco Maritime A/S
Esbjerg Brygge 30
6700 Esbjerg
Denmark
CVR no. DK 2549 0762
REX-no. DKREX170591191
EORI no. DK25490762
Structural engineering and design: Ranging from simple pipe supports, transport frames and sea fastening for offshore wind turbines to large equipment modules for offshore topsides.
Download
Fabrication of steel structures: Reliable fabrication of a wide range high quality modules, skids, steel structure and piping.
Download