Customer: Valaris PLC
Period: June 2023
Location: UKCS
Design and conceptual Study of SCR system for 4x Wärtsilä 8L26 engines.
Solution:
- Conceptual Study Engineering (structural, piping & electrical)
- Location Installation of UREA tanks
- Structural analysis, design and installation of SCR unit platform.