Customer: Bladt Industries
End customer: Ørsted Energy
Location: The German part of the North SeaCapacity: 450 MWPeriod: 2012-2013 

Activities
image-png-Jul-22-2025-11-46-41-1102-AM
Solution

A full electrical engineering, procurement, construction and installation (EPCI) contract covering substation for the Borkum Riffgrund 1 offshore wind farm. The project involved several electrical disciplines including low-voltage systems.

Competences and systems:
  • Project management
  • High-voltage and medium-voltage systems
  • Low-voltage systems
  • Diesel generator systems
  • Protection & control systems
  • Drainage and waste systems
  • HVAC systems
  • Communication and IT systems
  • Platform identification systems
  • Transport/spacing
Highlights
  • Positive feedback from customer regarding general workflow and quality of work delivered
  • The project was delivered on time