FEED Study for HVAC Platform

Customer: Vineyard Wind LLCLocation: The Atlantic Ocean, offs the coast of Massachusetts
Period: 2018-2021
A full FEED study aimed at making an optimal design for an 800 MW offshore substation for the US market. The design should be economic, yet with a robust structure, optimising efficient installation and topside in accordance with American IEEE standards and partially IEC standards. The basic design included considerations to reduce maintenance requirements to a minimum.
Competences and systems
  • High-voltage, medium-voltage and low-voltage systems
  • Diesel generator systems
  • Protection and control systems
  • Drainage and waste systems
  • HVAC systems
  • Communication and IT systems
  • Firefighting and safety systems
  • Platform identification systems
  • 3D modelling
  • Structural elements – jacket and OSS topside
  • Project schedule and execution philosophy
Highlights
  • The electrical FEED study was delivered within a very short time frame
  • Very positive feedback from the customer on the quality of work (‘best and smartest design I have seen’) and communication