Company re. no. HRB 203884
Tax no. 2248 048 7440200
Customer |
Northland Power |
Location |
The Netherlands and offshore (North Sea) |
Period |
2019 (10 weeks) + 5-year service agreement |
Project scope |
Construction supervision and commissioning of the offshore substation (OSS) for the Deutsche Bucht wind farm. The scope also includes inspection feedback, creation of punch lists as well as hot and cold commissioning assistance during the offshore hook-up phase and maintenance from June 2019. |
Customer |
Innogy |
Location |
German North Sea |
Period |
2016 - 2021 |
Project scope |
Five-year service contract covering service and maintenance of all systems on the Nordsee One offshore substation and transition pieces. The project covers both scheduled and unscheduled service. The service team is available 24/7/365 for maintenance and troubleshooting. |
Customer |
Energinet |
Location |
Rotterdam Fabrication and Kriegers Flak |
Period |
2018-2019 |
Project scope |
Provision of offshore supervision for safe and efficient installation of all HV sea cables during the construction phase. The job scope during the installation phase included management of scaffolding, supply of scaffolding equipment, cable pulling and supply of manpower. |
Customer |
Ørsted |
Location |
Cuxhaven, Germany |
Period |
2018 |
Project scope |
The scope of work included assembly and welding of 20 suction bucket jackets. Parts produced in Poland, but assembled and welded in Cuxhaven prior to offshore installation.
|
Customer |
Ørsted |
Location |
German North Sea |
Period |
2018 |
Project scope |
Installation of OSS light container (20’) with 33 kV switchgear on OSS jacket for BKR02. The installation also included welding and clamp-on interface plate/beams for the support of equipment. The offshore installation was supported by a supply offshore vessel (SOV).
|
Customer |
Iberdrola |
Location |
German North Sea |
Period |
2016 - ongoing |
Project scope |
HV commissioning and energisation of offshore substation. Implementation and supervision of all electrical safety aspects. Day-to-day platform operation during the construction and interim operation phases and final handover for permanent power transmission. |
Customer |
Global Tech 1 Offshore Wind |
Location |
German North Sea |
Period |
2017 - 2018 |
Project scope |
Service jobs: Fire alarm and firefighting systems, oil-water separator, HVAC system etc. Modification jobs (new automated hatch, upgrade of seawater cooling system, upgrade of HVAC system, corrosion protection campaign ’18. Complete EPCI and multidisciplinary offshore commissioning jobs.
|
Customer |
EnBW Baltic 2 s.c.s. |
Location |
German part of the Baltic Sea |
Period |
2017 - 2018 |
Project scope |
Semco Maritime provided:
|
Customer |
Vattenfall |
Location |
German North Sea |
Period |
2017 |
Project scope |
The scope included 24-7 surveillance of all systems, including service and maintenance of various systems. The wind farm is monitored via the SCADA system. Service and maintenance of all auxiliary and safety systems such as transformers, diesel generators, low-voltage (LV) system, fire alarm system (FAS), fire extinguishing system (FES) and PA/GA CCTV.
|
Customer |
Vattenfall |
Location |
German North Sea |
Period |
2017 |
Project scope |
Annual test of fire alarm system and fire extinguishing system on offshore substation and accommodation platform, including test of interfaces to auxiliary systems, e.g. SCADA, ESD, CCTV, PA/GA and diesel generators. Test is performed according to regulations and operation/maintenance manuals.
|
Customer |
Aarsleff / Nissum Bredning Vindmøllelaug |
Location |
German North Sea |
Period |
2017 |
Project scope |
Installation of lighting fixture on four test transition pieces (TPs). Earthing of all lighting brackets, cable ladders, handrail and davit crane. Connection of earthing to armouring. Measuring of resistances less than 10 ohm. For the first time in the world, the structure of the TPs was made inconcrete.
|
Customer |
Ørsted |
Location |
German North Sea |
Period |
2016 - 2017 |
Project scope |
Test of LED HAPI lights on helideck, test of SCADA system and fire alarms, update of UPS system (change of batteries), engineering of oil separator PPM equipment, modification of navigation light and testing of weather forecast systems and HVAC.
|
Customer |
Ørsted |
Location |
UK North Sea |
Period |
2016 |
Project scope |
Installation of TETRA system as well as installation of fibre cables for more than 10,000 connections. Coordination of workflow between sub-suppliers and owner of Burbo Bank offshore substation:
|
Customer |
Ørsted |
Location |
German North Sea |
Period |
2016 |
Project scope |
Service and modification of various systems on the Gode Wind 1 & 2 offshore substations. The contract also included an Overall Lead Manager responsible for both substations and for day-to-day planning, supervision, progress reports, communication and coordination with subsuppliers etc.
|
Customer |
Innogy |
Location |
German North Sea |
Period |
2016 |
Project scope |
Annual test of fire alarm system including all interfaces to auxiliary systems, e.g. fire extinguishing, SCADA, ESD, CCTV, PA/GA and diesel generators. Testing is carried out according to regulations and operation/maintenance manuals.
|
Customer |
Ørsted |
Location |
UK North Sea |
Period |
2016 |
Project scope |
Installation of TETRA system as well as installation of fibre cables for more than 10,000 connections. Coordination of workflow between subsuppliers and owner of offshore substation: Installation of backbone for SCADA system, connection to SCADA system, TETRA system, RAMS and service report.
|